Bengaluru Metro Pink Line opens elevated stretch with over 33,000 riders on Day 1
The newly opened 7.5-kilometre elevated corridor slashes travel times across South Bengaluru as high-tech BEML trains enter public service.
Bengaluru's urban transport infrastructure achieved a key milestone on Saturday, 14 November, as commercial operations commenced on the elevated section of Namma Metro's Pink Line, drawing 33,409 passengers on its first day. Flagged off by Prime Minister Narendra Modi a day earlier, the newly operational 7.5-kilometre corridor provides modern rapid transit along the heavily populated Bannerghatta Road belt.
Running from Kalena Agrahara to SG Palya across six stations, the line has delivered immediate traffic relief to South Bengaluru commuters. Journeys between Hulimavu and SG Palya that previously took up to 40 minutes by road were completed in under 15 minutes on the metro. Greater Bengaluru Development Minister Krishna Byre Gowda boarded the inaugural 6:00 am service to greet early commuters with pink roses, while Karnataka leaders joined passengers during the weekend to inspect the new facilities.
| Corridor section | Distance | Station count | Operational status |
|---|---|---|---|
| Kalena Agrahara to SG Palya (Elevated) | 7.5 km | 6 | Open to public |
| SG Palya to Nagawara (Underground) | 13.76 km | 12 | Trials expected 2027 |
The Pink Line features modern trainsets manufactured by indigenous PSU BEML Limited. Built with Communication-Based Train Control (CBTC) technology, the six-coach trains are fully driverless-capable and come equipped with ergonomic seating, onboard USB charging ports, real-time digital display boards, and upgraded emergency communication systems.
This elevated section forms the southern anchor of Namma Metro's 21.25-kilometre Pink Line project under Phase 2. Construction continues on the remaining 13.76-kilometre underground tunnel network, which will connect central commercial districts and northern tech hubs through to Nagawara, cementing Bengaluru's position as a leader in modern transit infrastructure.
Key numbers
| What | Figure | Source |
|---|---|---|
| Day 1 ridership | 33,409 passengers | Bangalore Metro Rail Corporation Limited |
| Operational elevated length | 7.5 km | Bangalore Metro Rail Corporation Limited |
| Operational stations count | 6 stations | Bangalore Metro Rail Corporation Limited |
| Total Pink Line corridor length | 21.25 km | Bangalore Metro Rail Corporation Limited |
In this story
| Name | Role in the story |
|---|---|
| Bengaluru | The city where the new metro line was launched. |
| Namma Metro | The metro rail system operating the Pink Line. |
